Jump to content
 

Reflections on progress...


Paul Robertson

254 views

So it's been a while since my last update. Progress has slowed on the railway through January and February as I have been volunteering at a vaccine clinic many weekends, work has been taking up a lot of time, and two children's birthdays needed attending to. I found myself with a spare couple of hours this afternoon so decided to work on the side back scene. Having spent a couple of hours trying to sketch in convincing perspectives to carry the quayside into the back scene it was proving impossible to find something that looked convincing that I could paint on. Instead, I decided to try a mirror. I've seen this done on other layouts in the past and it helps to convince the viewer that the layout carries on into the distance. Looking on Amazon I found some self-adhesive flexible mirror tiles which seemed to do the job so sent off for a pack. 

 

Having received them they were very easy to cut with a hacksaw (bit too thick for my craft knife) and then mount onto the hardboard back scene. 

 

IMG_20210207_162011.jpg.1564c00b0050064818446799c8058cb9.jpg

(the basic tile in place) 

 

Whilst it gave a nice affect the transition from the top of the mirror into the back scene painted cliff was a bit abrupt so I wanted to place something here to cover this up. Scratching around in my offcuts box I still had some corrugated sheet and styrene strip so decided to make a link bridge from the station across the top of the mirror to the ferry for foot passengers. 

 

IMG_20210221_183306.jpg.beea2a1bd68b7c9ad58443fe41dadf5a.jpg

(Painting up the bridge) 

 

IMG_20210221_183650.jpg.88defe4bb066f1e7b8f6c122ecc6a103.jpg

(pedestrian Bridge glued in place) 

 

I decided to use the mirror to my advantage by creating a half A-frame structure with a yellow concrete base and letting the mirror do the rest of the work 

 

IMG_20210221_184938.jpg.2baba2328e8f0b8edb23e2c3704e987d.jpg

(a-frame in place thanks to some smoke and mirrors) 

 

IMG_20210221_185022.jpg.f58ddf6732ba45fb7e1fd61e66299fb6.jpg

(the quayside doubles in length with not much more effort) 

 

Still working on the station detailing and building the control tower on the cliff which is work in progress. 

 

 

  • Like 1
  • Craftsmanship/clever 1

0 Comments


Recommended Comments

There are no comments to display.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...