continued
Track laying starts afresh. Put in the crossover between the platforms. This will enable trains from the branch, not modelled, and the local train from Salisbury to run around before shunting into the bay. Laid a single line around the curve back to the doorway as well today. This will dissappear into a tunnel(now there's a novelty). Maybe get the second line through the curve tomorrow after work. A few of shots of progress so far.
M7 sitting on the crossover.
View down through the platforms.
Second track laid in the curve tonight. With luck I may get the track through the platforms down tomorrow.
Did some more work in the station area today. Track is now laid through the platforms, but work has stopped while I wait while the cork is glued down.
Road bridge over end of platforms. Put this here to disguise the entrance into a fairly sharp, 30"rad, turn. Beyond the curve it will run through a cutting towards the tunnel.
My attempt at an atmospheric shot. Spoilt somewhat by the sun through the window. The two windows in the shed that get direct sunlight through them are fitted with UV blocking film.
Same shot as above but using flash.
edit for lousy grammar
0 Comments
Recommended Comments
There are no comments to display.
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now