Slow progress.
Evening all, Having little or no time to work on the layout at moment is getting quite frustrating and when i do eventually get to do some i seem to get absolutely nowhere, however, last few days i have managed to do some small jobs. First off was the ballasting on the Lower main lines with associated greenery, all that remains to do is weather the track and sort the over head wires, (think i'l wait till i'm feeling more patient).
Second job was to ballast the inside of the mail terminal and lay the platform surface which was done with pollyfilla, rubbed down and painted grey, Again i need to weather the track inside, also need to get trolleys, people etc.
Other progress has been on the wiring side, fitting more wire in tube and Peco point motors.
On a little bit of down side, in my haste to push things forward i forgot to drill out holes for the signal and point motor(photo below),so to rectify the problem i've either got to drill an over sized hole from above and make good or remove a section from beneath, not to sure which way to go yet?
Graham.
0 Comments
Recommended Comments
There are no comments to display.
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now