Progress before my return to EM
No I havn't given up on the 2mm and hopefuly I'll be able to get back to it later in the year, but I have been working on my EM stock for the past month and I now require the space, so I've had to box up the 2mm whilst I do some work with an EM gauge layout, Morfa Mawr. http://www.rmweb.co....__1entry48479
This has a couple of exhibitions to get ready for, of which the first is STORMEx in August. http://www.rmweb.co...._1entry122363
I took a few photos of the 2mm today before packing away and although the quality is rather poor I'm affraid (fluorescent lighting), it will give you an idea of what has been done so far. I had hoped to of progressed a bit further, but I'm happy with what has been done and will look forward to getting back to the detail work at a later date, of which hopefuly we'll see it all come together.
A look at some of the part finished buildings that make up the backscene, these are buisness and retail premises of which most back on to the railway. I had a count up and these will require 126 windows and frames to be made for them
And then we come under the railway bridge to the front of the layout, where we still have a large unstarted area, the plan was for some terraced housing but this may change.
Next the signal box which sits just off the platform ramp, the signal is a Ratio item and is only temporaily for placement.
Looking along the line from the bridge end.
And looking the other way from the coal yard.
Trevor
10 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now