Calshot MkII - Building a control panel + track laying shenanigans!
After a completely naff start to the day with trying to amending mistakes that I made last week (which I again made the same mistakes today!) I decided to leave the 009 point giving me grief and complete about 70% of the NG track. Just got the rest to lay tonight and then the four feeds to add before John comes tomorrow to kindly finish off all the wiring.
This photo should explain the point predicament (and this is after supposedly realigning the the point and motor!):
The realignment of the point means some tight clearances between NG and SG but reduces the sharp curvature of the NG. (Win some, lose some!)
An overview of the progress at around 3pm:
This evening I've been building the control panel. Although I wasn't supposed to be making it out of acrylic (wood would have been quite adequate!) I did in the end decide to as it looks smart and I had already drawn the schematic diagram onto it anyway:
And a rear view:
Hopefully this is adequate for John when he comes to wire it up. The blank area on the right of the control panel will house the controllers once I make some form of holding device.
The control panel will be attached to the underneath lattice sub-frame which in turn holds all the wiring. A bit of card will then be placed under the lattice truss where the wiring is to protect from wondering fingers (or is that protect wondering fingers!).
Looks like I'd better get on with the track laying and feeds!
If you have any questions just ask.
4 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now