Jump to content
 
  • entries
    5
  • comments
    0
  • views
    2,082

had fun working grain


alcoRS1

255 views

I have 11 grain hoppers at the drop site for the food processing plant, I GE 44 Toner works the switching, I had so much fun switching the grain hoppers around until I had emptied all 11 of them, and sorted them for pickup. I have limited space, 5 4 tracks including the drop shed. on track can hold 5 hoppers the other 4 hopper, 3 hoppers then the loading shed spur can hold 2. There is a small drill track that allows me to switch up to 3 cars at a time.

 

Other areas so far I have got to play with is an oil terminal, US Army rail head. a small RIP and Loco terminal, a scrape yard, factory with 2 leads, one for box car loading the other for raw materials hoppers, a small scrap yard, then 3 other industries yet to be determined. Lastly I have a small port and ammo dump for the US Navy.

I am adding a second level above the staging area, which will have a small downtown scene with a commuter line, and a small GE25 toner for some industrial switching.

0 Comments


Recommended Comments

There are no comments to display.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...