After hacking up the track, I have now managed to get the main passing loop installed in the station on the main baseboard. It is looking a lot better than it did before, although I am not too pleased about the track running straight into a tunnel so I am considering changing the freight sidings and the depot side around, although I am really unsure about this right now.
Anyway here are some pictures:
The track soon after it was layed.
Some test trains. I can now get a 4 carriage Corail train in with a locomotive and still run trains through. Far better than just being able to have 2 carriages in the loop!
The village was put back so I could get a feel for how it looked overall. I was quite pleased with it. I am looking forward to getting my products from Busch to make the roads better.
This week I will decide on the positioning of the depot and sidings and start thinking about laying them. Then I might lay the track onto the next baseboard!
Thanks for reading
Stephen
- 1
0 Comments
Recommended Comments
There are no comments to display.
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now