Chagford - Musing about using Easitrack.
Hi All
The trackbase for 2FS Easitrack is moulded in scale 60 panels. Once the code 40 rail is inserted, whether you have chosen the wooded or concrete sleepers it looks the part. But for beginners it is difficult to lay sweeping curves, without kinks occurring at the join between the trackbase sections. This was first pointed out to me by Noel Leaver at a 2mm event some years ago. This blog entry is the result of my musings on the problem!
My considered solution, this may to some appear to be a bit of a faff, but the technique should not be beyond the skills of a beginner. The resulting track sections can be laid using the same techniques as for example laying Peco Streamline track.
By inserting the extra piece, using the same material, from which the track base is manufactured from, using the Easitrack glue. The result is as shown below.
Lisa
0 Comments
Recommended Comments
There are no comments to display.
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now