Finished with the track and point-work building
Slowly, slowly I managed to finish with the track laying. All the track and the turnouts are in position, glued with PVA to the baseboard.
I used a small Graham Farish wagon, converted to 2mm standards to test the track by slightly tipping and taping the baseboard, and everything looks to be fine.
And I have just started with the electrics. Actually, half of the rails are already wired.
The next step will be to build the controller and make the real track test by running the converted Class 24.
- 2
3 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now