Chagford - Operating Sequence
Modified 23-05-12 & 26-05-12
Hi All
It is my intention to operation of Chagford on a sequence, based on the operation of the prototype. The red entries didn't run every day.
The sequence may seem at first sight complex, but every tram operated is a minimum of three lines in the table below
My intention is to use some form of random number generation, to decide if the non regular trams are included in the operating sequence.
The next stage of the design process is to dry run the sequence, to see if it works, including if the sidings are long enough to hold the wagons.
Lisa
2 Comments