Jump to content
 
  • entries
    2
  • comments
    7
  • views
    2,302

Entries in this blog

Delph - Back to slow progress

After departure of the visiting West Country and its train of enthusiasts, it's back to the slow progress with layout construction. I must say, without the station and goods shed in place, it does look to have taken several steps backwards!   Since my last post, back in December '10, I have been working on the station board. All the track is now wired (except final connections to the Tortoise moters and AJ uncoupling magnets), cosmetic chairs fitted to the points and cosmetic fishplates fitted

Dave Holt

Dave Holt

Delph - Work under way again

Finally got fired up again today and went over to the work-shop to retrieve two more boards for equipping with point motors, AJ uncoupling magnets and wiring. Based on how long it took to wire the first board, I expect to re-emerge some time next year!!!   Took the opportunity to trial fit the coal drop deck with the boards assembled. This revealed the need for a bit of trimming to length which was done. Unfortunately, there's been a slight warping of the main timbers, so this will have to be

Dave Holt

Dave Holt

×
×
  • Create New...