Cul Uisge - Kyle in 4 feet - Update Time!
The blog hasn't been posted to for nearly a year so I though a quick update was in order.
Not a massive amount of progress due to health problems and getting distracted by building some 1980s Strathclyde DMUs and EMUs but the fiddle yard has had an extra siding added to add a little flexibility.
The station building has had the metcalfe slates replaced with slaters plasticard ones and a coat of paint. It looks a bit better but still needs some more weathering.
Finally, a view from under the bridge looking towards the station.
Once the station building is finished, the small platform on the front right of the layout will be detailed and finished as an engineers depot with a portacabin.
I also have a Gaugemaster "clouds" backscene to install.
After that it will be some weathering, particularly the track and ballast, and some detailing.
Andy B)
- 3
2 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now