Hi all
Well were did this all start? As well as Glenuig, I have a little 0-16.5 slate quarry layout, while I have been exhibiting Glenuig, a few exhibition managers have asked me if I have anything else I could exhibit. So the slate quarry has a few invites to shows. The layout has little operating potential so I will leave a train circuiting for long time periods and only having two locos I could see a problem using this method, one boredom, and two, wearing the little things out. What I ne