Well it’s been 3 days since the Uckfield show and my knees have finally recovered from standing for two days and grubbing around under baseboards during set up😀 The layout behaved it’s self and despite the fact that I can either talk to the public or operate the layout, but can’t do both at the same time everything went to plan!
I collected the hire van at 10.00am on the Friday morning and with the help of my pal and master fiddleyard operator Roger the van was loaded with the layout