Jump to content
 
  • entries
    2
  • comments
    5
  • views
    841

Entries in this blog

Platform contruction, Point rodding and Signal

Good morning all, just a few photos to show the progress over the last few days.   I've started to build the platform and installed the new Dapol signal. I'll probably replace this with a MSE signal in the future but for the time begin I think these signals look very much the part.   The platform needs a good weathering and I still need to add brickwork.   I've completed the track weathering, just want to add a bit more detail by painting some sleepers as if they had been recently replaced

ac2012

ac2012

Introducing Quatt

Hi all, I'd like to introduce myself and my layout.   I'm a N gauge modeller of five years who has recently changed to modelling 00. I live 5 minutes from the SVR (kidderminster end) and so I tend to model GWR but am trying my hand at LMS of late.   My current layout I call Quatt, fictional layout, but taking its name from an area not far from myself that never had a station, but if it had, I'd like to think, would be something similar to the Quatt I'm modelling.   Having not modelled 00 i

ac2012

ac2012

×
×
  • Create New...