2 of the 3 Sidelines LMS coaches I'm working on have been primered - it might be warm enough for top coat today. I also went to the expense of adding the suspended gangway, it does make a significant contribution to the clutter on the end of the coach - worth doing.
Right - I think I'm getting it, the previous tatster shows mdoified ends with steel channels replacing the lower planks.
Just working on 4 Parkside Opens that incorporate the wooden underframe from the fitted van, and the body from the unfitted kit. I'll be demonstrating them at BRM Peterborough alongside Dikitriki.
Come and say hello.
The fitted gubbins takes shape