Getting down to it, 2mmFS wagons take just as long to do as their bigger brethren, perhaps longer, there’s a lot of fiddling. So some vans and now a few opens are receiving their numbering and lettering. It’s all CCT Transfers applied on gloss varnish then matt varnished over.
I also ripped up the first 2 foot of Easitrac, it was too thick in glue and I hadn’t really thought through the wire droppers. The new length is almost ready to lay, pictures as it happens.