Jump to content
 
  • entries
    266
  • comments
    645
  • views
    159,707

About this blog

What's on my workbench and other musings

Entries in this blog

9MT - The Bigger Bunker

A class 9 loco with class 4 coal capacity was never going to work, also the twin axle rear bogie kicked out beyond the rear buffer beam. The end of the bunker was cut off where the footstep indentations were on the bunker tops and then slits cut to separate the sides from the coal load and supporting structures. Two scrap bits of plastic were cut to the right size to splay out the sides so they were parallel and more supports glued in to hold them. A steel rule clamped to one side helped to get

RedgateModels

RedgateModels in General

×
×
  • Create New...