Discovered today that I had ordered a different track (PECO SL-300F I believe) than I usually use - SL-300.
The result was that the track on the deck was approx 1 or 2mm lower than the track on the layout. Hmm...
If I hadn't used "set track" points at the top of the traverser I could just raise the whole thing.
However, the solution was pretty simple - a (temporary) strip of plasticard of the right depth, to lift the track very slightly.
I already have s