Work has slowed down again on these two. I ordered some phospher bronze strip over Christmas to make up the pick-ups, however it was out of stock. I'm hoping to find some at the Stafford exhibition and then get these two running.
In the meantime I've done a bit more work to the bodies. The kit is supplied with a couple of small etches for the cab floor, obviously not the whole floor as the motor and gearbox sit inside the cab. These pieces sit either side and are only used for the open cabbed version as the floor is visible through the door opening. The photo below shows one floor piece soldered in place and the other in front of the loco waiting its turn;
Handrails soldered in place and roofs fitted;
Hopefully I'll have more progress to show you soon.
Paul.
- 16
2 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now