At last some progress worth reporting. There were several steps forward and then backward over the Christmas break but at last the Medina is bridged, I've laid track over the baseboard joint into Newport and am now building and laying the track in Newport Station. The picture shows the non IOW loco I am using for testing. It is simply the most reliable small loco I could find in the local shop - it runs beautifully! The first turnout should be a three-way but I had already (by mistake) designed and built the lever frame without the necessary interlocking.
- 3
1 Comment
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now