Lighting done (well apart from the actual lights!)
I am Christmas crackered but the woodworking is all done for the new lighting rig. I moved on from the last posting by adding the pelmet that for Fourgig East sits to the left of the public
You will see that the support is set in 9" from the edge so that the bottom of the legs will not stick out beyond the nominal footprint of the layout - I have had them kicked too many times by neighboring operators to leave it as it was!
I will have to add some packers to the key points on the underside of the layout to ensure all is level.
Moving swiftly on to the shorter fiddle yard/shed road pelmet for Fourgig, to the right of the "centre" board as the public see it
You can see my drive is not exactly level! Again the supports are set in 9" from the edge (nice car ....) The next pic shows the back of the pelmets and the method of dowelling the end ones onto the centre one.
Finally I took the time to put further work into the left pelmet to make it so it fits on the right for Summat Collery
The photo shows the rig in full "Summat" mode with the support on the left removed as the fiddle yard is non-scenic.
So, just need to get the lights. I'm planning on led as they will be light (ho ho) and very low profile. I also need to have a mammoth painting session and get a sign made for Fourgig and Summat to velcro to the centre section.
Back to work tomorrow for a rest
- 3
3 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now