Churchill Halt Trackwork 2


ROSSPOP

1,016 views

So trackbuilding progresses at a sedate pace in the `senior` scale..... The way I had made the `servo` assisted crossing gates meant that I needed to fix them in place on the diorama before driving the `railroad` through.....

 

blogentry-17779-0-62196600-1439931527_thumb.jpg

 

I`m not gluing the track in place yet but am building in `sets` as I go along.....

 

blogentry-17779-0-12950400-1439931505_thumb.jpg

 

I`ve halted at the turnouts as I need to fabricate some 7mm sized turnout operating units.

 

 

blogentry-17779-0-78500100-1439931659_thumb.jpg

I `m intending to use the same system I have used in 4mm......angle cranks above and below baseboard connecting with rod and tube....

 

These are some 7mm trade offerings I`ve gathered over the past year and have managed to make some robust units...

blogentry-17779-0-82816900-1439931547_thumb.jpg

 

The C&L turnout kits I`ve had for sometime and used rather thin paxolin as stretcher bars which I fabricated a holed lug as the attachment point for the actuator rod.

 

blogentry-17779-0-72198300-1439931612_thumb.jpg

 

thank goodness you can get 14BA nuts and bolts !!!!

 

blogentry-17779-0-90951100-1439931568_thumb.jpg

 

blogentry-17779-0-92519600-1439931583_thumb.jpg

  • Like 5

0 Comments


Recommended Comments

There are no comments to display.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...