Where I left off 10 years ago...... Entry posted by ROSSPOP October 15, 2015 836 views Share More sharing options... Followers 1 I `ve nearly finished the BR 1P so here is the coach......... I changed the bogies to full MJT parts and MJT Sprung buffers. The roof is completed so its just the interior and coach lining to do....... This was the inspiration........ 7
RMweb Gold Corbs 14,132 Posted October 29, 2015 RMweb Gold Looks good, was the prototype photo taken during a shunting move or is the brake van attached in operation? Link to comment
RMweb Gold ROSSPOP 2,315 Posted October 30, 2015 RMweb Gold Thanks Corbs I don't know exactly but I've seen many a photo of push- pull locos sandwiched between the coach and a short pickup goods train, so this pic may be showing the return trip of just the brakevan. John Link to comment
RMweb Gold Corbs 14,132 Posted October 30, 2015 RMweb Gold Ah that makes sense. I wonder if the coach was left attached when shunting the pick up goods? Link to comment
RMweb Gold ROSSPOP 2,315 Posted October 30, 2015 RMweb Gold Again I have read (somewhere) probably in my other GWR passion that shunting was done with at least single push pull coaches still attached. I`m sure it would be too much hastle and time consuming to keep disconnecting three hoses and a coupling at every shunting turn, particularly if it was just a couple of wagons. John Link to comment
4 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now