Jump to content
 
  • entries
    400
  • comments
    930
  • views
    288,483

Stour Valley in P4, Double slip laid


Fen End Pit

1,146 views

I was really not looking forward to building the double slip. Two crossing Vs, eight switch blades and the horrible obtuse crossings. Building this lot off the baseboard is the best idea and I tend to build the crossings and solder them up individually on nickel-silver scrap etch. These sub-assemblies then get stuck to the sleepers with epoxy carefully jigging them to gauge.

 


blogentry-7212-0-33407800-1476306686_thumb.jpg

 

The obtuse crossings are the hardest to make and get aligned but they are the most critical bit. I'm prepared to sacrifice a little detail to get them solidly made and once the half chairs are stuck on it doesn't look too bad.

 

blogentry-7212-0-80688700-1476306954_thumb.jpg

 

I was able to make such rapid progress on this because I could reuse some of the components from my previous layout. My previous attempt at a double slip was slightly longer which was handy as I could refinish the switch blades and shorten them to fit. This is one place where the lost-wax brass casting C&L fish-plates are worth their cost because it makes fastening the switch blades to the obtuse crossing so much firmer. With the length of the switch rail there are only 2 or 3 chairs to hold the switch rail otherwise.

 

blogentry-7212-0-21904000-1476307205_thumb.jpg

 

With the assembly completed, just waiting for the tie-bars, holding the blades open with a bit of scrap ply allowed for the 'WEEEEEEEE' test. (you put a wagon on, push it along and hopefully it go 'WEEEEEE' not 'WEEEE-crunch')

 

I removed the double-slip from the temporary base and fitted the tie-bars. Again I was able to reuse ones I'd made before using brass scrap etch and some very thin double-sided paxolin. These are a pig to solder on, particularly to the two 'inside' blades where there is very little room. One of the potential problems is a tie-bar rubbing on the rail of the opposite polarity so I was careful to check for short circuits with a meter. I've stuck a little bit of insulation tape under the rails where the tie-bar might touch just to make sure.

 

blogentry-7212-0-46090900-1476307625_thumb.jpg

 

Once again the marking of the cork sheet with the track alignment came into its own when sticking the pointwork down. Just knowing that the alignment is right is so helpful. I had to make the holes I'd cut in the baseboard for the operating mechanism a bit bigger than I'd cut them on the laser cutter. I was able to use the two 'double-slip turnout operating units' from the previous layout to move the blades and get a couple of servos connected up. Wiring is straight-forward with the relay which switches the servo at one end also switching the polarity of the crossing V at the other.

 

In the background you can see the test train. The rewheeled and unsprung Hornby class 31 is the most fussy locomotive I have, the 6-wheel bogies have a tendency to pivot on the centre axles and derail unless the track is level. The nice thing is it doesn't fall off! I had to do bit of minor tweaking to get some of the longer wheelbase steam locos to go around one of the slips, there is a tendency for these to get tight on gauge and I had to ease the rails a little bit. I've also found a couple of wagons which didn't like it but then found they had a slightly wide back-to-back on their wheels.

 

The alignment doesn't look too bad. First view is from the cattle-dock towards the goods-yard and then from the yard-entry.

 

blogentry-7212-0-90524400-1476308180_thumb.jpg

 

blogentry-7212-0-51716900-1476308265_thumb.jpg

 

I'm really looking forward to being able to reverse a long pickup goods train back into the yard siding and then shunt wagons in and out of the shed. Now I've got the double slip built I think I'm one step nearer.

 

David

  • Like 8

6 Comments


Recommended Comments

Although only in EM, I built the double slip for my layout first, on the premise that if I could build that, I could build all the "easier" trackwork....

Link to comment

As you know, I'm following you (at some distance) through the recreation of Clare in model form and you are setting a high benchmark.

As you say, having the track formation/alignments plotted straight onto a good flat, stable base pays dividends for accurate placement and alignment.

It all looks spot on and very tidy.

Keep it coming.

Roger

Link to comment
  • RMweb Gold

Somewhat after the time of posting, but when you have assembled your points and crossings, how do you remove them from the double sided tape I think I can see? Do you de-tack the tape a bit first, or dissolve it away using white spirit?

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...