Jump to content
 

Modelling resumed with Early Airfix - (now Dapol) non corridors


pbkloss

670 views

blog-0719290001509304592.jpeg

In a previous post called 'modelling again' I described the trials of detailing a pair of Airfix Inter District LMS non corridors (now made in kit form by Dapol), tackled just before a house move. Now having moved, some modeling has resumed in the midst of the necessary work after moving in. So first in the queue was the local train.....

 


Almost finished, I discovered that the underframes were the wrong way round on both coaches. This I found by looking at prototype photos in 'Modellers and enthusiasts guide to the Somerset and Dorset line' (Brian McDermott, pub. Patrick Stephens) photos on page 25 and 30. Not a quick job as reversing the underframe on each one meant that the bodies and the interiors needed cutouts in the floor at the reversed end to clear some Roco 40344 close coupling devices that I was trialling as inter set couplings at the inner ends of the set. (Because these were set at buffer beam height to clear the bogies they fouled the floor - I had already made the cut outs at the 'wrong' ends). Having done this they are back together and just need a coupling bar between to join the two. Outer end couplings are Dingham. Two photos show them with ex Bath GP Jinty 47465 posed on my test track.

 

blogentry-18041-0-12505100-1509303525_thumb.jpeg
blogentry-18041-0-10775100-1509305294_thumb.jpeg

  • Like 2

7 Comments


Recommended Comments

Obvious mistake with a shifted roof - they're not fixed yet! However almost ready to work a local from Weston super Mare (S&D) to Glastonbury...

Link to comment
Guest Jack Benson

Posted

Thanks for posting, what other modifications did you make to the coaches, if any?

 

Cheers

 

Jack (helping with another SDJR project)

Link to comment

Sorry Jack I've only just seen this, and that by accident! The mods done are:

 

Bogies compensated with MJT frames, Airfix / Dapol frames stuck on, wheels 18.83 3'6" disk

Door handles and grab handles carved off and replaced by filed down dress making pins (for handles) and wire (grab rails)

Under frame detail added - regulator box fattened, cross bracing added to frame struts, checked for right way round-ness as above

numbers and class markings added, HMRS press-fix

Flush glazed with SE fine cast parts

Cards duckets windows carved out and PVA glazed 

Buffers sprung

Outer couplings of set replaced with Dingham, loop both ends (so I can run them either way, something I've not explained at all yet in my blog, like 'Why?')

 

I'd like to do 'First' and no smoking labels if I can (!)

 

Still need to fix roofs and do the internal coupling

 

Regards, Peter

Link to comment

 yes I know they are on the sheet, but I think having fitted the windows and knowing how delicate the SE finecast glazing is I'll have to go very carefully applying them

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...