Jump to content
 
  • entries
    151
  • comments
    393
  • views
    87,292

Delph - Std Class 2 tank - brake ejector beaten into submission


Dave Holt

647 views

I'm slowly working through the remaining details needed to finish the body on this model. The current work has been on the push-pull vacuum control valves and steam pipes and the vacuum brake ejector. On these locos, these items are quite distinctive and are a major visual feature. Unfortunately, the items provided in the kit leave much to be desired, needing a lot of fiddly work to get anywhere near the right look.
The cast steam pipes and push-pull valves were grossly out of proportion. The only useable portion was the vertical steam pipe cover and even that was a millimetre too short - hence the 40 thou plastic packer. The horizontal portion was too long and the valve body just massive. A replacement valve body was fitted and the gap filled with low melt solder. Various drain pipes and the actual vacuum controls remain to be fitted.
BR standard locos were fitted with a Gresham & Craven SSJ brake ejector mounted on the LHS of the smokebox. This was quite different in appearance to previous ejectors fitted to LMS and GWR locos and, again, the kit item just wasn't right. In fact, I'm not aware that anyone supplies a good representation of this item and this is the third I've scratch built so far. In total, there are 22 component parts in the ejector assembly so it would have been more sensible to use the first as a pattern and have castings made! Anyway, another ejector has been made. On this loco, there is the added complication of the discharge pipe having a 90 degree bend to avoid the steam pipe cover.
Initially, I tried to make the pipes out of tube so I could have joints aligned with brass wire but I found the tube just kinked and flattened at the bends and in the end I had to use a single length of solid wire. This made getting the two right angle bends the right distance apart rather difficult.
A great deal of adjustment, fiddling and not a little cursing was involved to get it all assembled into position. Despite the struggle, I'm fairly pleased with the result. The steam supply pipes (and blower pipe), which run along the top of the side tank are still to be done.
A couple of photos illustrate the parts described.

 

blogentry-5663-0-09700900-1522438411_thumb.jpg

 

blogentry-5663-0-36860700-1522438434_thumb.jpg

 

Dave.

  • Like 1

0 Comments


Recommended Comments

There are no comments to display.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...