Jump to content
 
  • entries
    7
  • comment
    1
  • views
    3,375

A fruitful day


Virago496

595 views

I went to visit the Aln Valley Railway yesterday knowing there is a model railway display. It was a very interesting and informative experience and i can only hope my layout will look half as good as this:
blogentry-34225-0-92999200-1525803989.jpg

 

So this morning I wentto work with renewed vigour. I painted the road in the centre of the board, acrylic paint directly onto the plyboard, it actually gives it a nice texture.
blogentry-34225-0-02475100-1525804447.jpg

 

The plaster that hadn't been has now been painted and the tunnel entrance, I had to use a double track version, the single wouldn't fit in but a double on an angle did. Let's just hope the trains will run past because I haven't tested that yet. then I reinstalled the missing bit of track in the corner and completed the bridge.
blogentry-34225-0-81413700-1525804951.jpg

 

After this I turned my attention to what I have planned for that corner, Months ago I had planned a big mountain there, even built it and stuck some trees on, but I changed my mind. You see I didn't have a station yet, what if i built it on top in that corner. I experimented cutting platforms from cardboard and so on but yesterday I managed to pick up some cheap curved platform. I'd already cut a piece of board to fit the corner and fabricated electric connections to it.
blogentry-34225-0-91346700-1525814470.jpg

 

 

 

Then yesterday I picked up some curved platform on the cheap and started to fabricate this:

 

blogentry-34225-0-55561800-1525814647.jpg

 

The board is 3mm ply and underneath have fabricated contact points with copper tape and solder, I've done the same at the back of the baseboard and this way I can remove this part to clear derailments underneath. Then I laid 2 copper tracks on the underside of the board to which all the lights are wired. The superquick country station i cut of a standard platform that i'd bought second hand and again I painted the ply with acrylic paint.

 

I spent the rest of the day trying to improve the look of the station and eventhough it's not done yet I'm very happy with the progress.
blogentry-34225-0-90079800-1525815249.jpg
blogentry-34225-0-98431500-1525815320.jpg
blogentry-34225-0-36336100-1525815400.jpg

 

Tomorrow I will plant some lamp posts, both at the station and in the main road and since my controller is finished I will test that. I feel a video coming on.....

 

Quick update: made the video, but the shunter kept derailing on the inner loop, changed the points for ones I bought second hand at a steel but not remade the video yet. Did some other track work but spent most of the day sorting out the little station board.blogentry-34225-0-54000500-1525898775.jpg
blogentry-34225-0-53746200-1525898973.jpg
Painted the pavement and installed some lampposts. Then I realised all the loose wires underneath could get entangled in trains running underneath so I taped them to the ply. still having trouble with the contact patches, I need to weigh the board down a bit to get a good contact.

 

Then just this last bit, the lamp posts in the village, here they are:
blogentry-34225-0-97237300-1525899994_thumb.jpg
7 inches apart, just stuck that in my calculater and its 13.5 meters in scale. recon it should be 30 meters in scale but hey what the hell.

0 Comments


Recommended Comments

There are no comments to display.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...