Bristol Barrow Road - Laying Storage Sidings
Just a quick update on the storage sidings. The total of turnouts built is now 11 with ten now fixed in position in the storage sidings and three of the sidings laid.
The turnouts are all constructed using 1.6mm thick double sided copper clad sleepers whilst the sidings are K&L and C&L lengths of flexitrack board joints strengthened using copper clad sleeper strips.
Over the hot weather I have checked all the rail joints on the turnouts and board joints and where necessary I have widened the gap using a very thin file - a very useful tool obtained some years ago from Eileens.
Here are some photos of the progress made so far. Once all the turnouts are in position I will fit digital cobalts and wire them in to two separate accessory buses.
EDIT;- Two more turnouts added since my last post.
EDIT:- Further progress as of this afternoon 24th July 2018. I have completed laying metre lengths of C&L Flexi track in the UP storage sidings. I have run out of the Evostick Timebond Adjustable glue I am using to fix this track and am having difficulty finding a replacement tube as B&Q don't have any local to me. I also need to order some more track and copper clad.
- 18
7 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now