Jump to content
 
  • entries
    41
  • comments
    137
  • views
    15,819

Westbrook Station Building


JDaniels

924 views

I've now completed the station building apart from the painting. Unfortunately due to the weather it looks as though we won't be going down to Ford tomorrow (celebrating Mrs. D's birthday) so the light and dark stone I was going to get from Gaugemaster will have to wait.

 

In my last entry I was about to make substantive progress with the roof. The jig I made to cut the tiles (in 5thou Plasticard) worked well apart from the odd occasion when I failed to notice the strip was firmly against the stop which resulted in a slightly narrower tile. Experience prompted me to make another jig (visible in the front of the building in the photo below). This was simply a strip of etched NS waste with a length of bullhead rail soldered to it. The distance between the edge of the waste and the edge of the rail is important as this will be the height of the tile visible. I made sure the first, bottom, row was in line and thereafter the other rows were laid by aligning the edge of the rail to the bottom edge of the tiles already laid. The next row was then laid with the bottom of each tile abutting the top of the etch. This ensured the row spacing was consistent and that they were all in line. As a check I ruled a few parallel lines on the underlying Plasticard base to ensure that as I went up towards the apex of the roof the rows were not sloping one way or the other which would have been disastrous for the appearance. Fortunately the template ensured this did not happen.

 

In total I think I laid about 600 tiles but with a ready supply of pre-cut tiles and the jig in place I found I could lay a row of 21/22 tiles in 2 minutes or less. I just put some liquid poly on the base sheet and picked up the tiles with the point of a craft knife, in fact it was putting the cement on that was the biggest hindrance to quick progress. As the underlying tiles showed above the jig it was easy to locate the tiles midway over the underlying joint and against the strip of NS etch. I can say that without these jigs I would not have been able to do the roof, I find difficulty in measuring millimetres from a ruler and even the smallest variance in the size of the tiles would have been immediately noticeable.

 

I thought the ridge tiles would be slate but photographs show conventional rounded clay tiles. This caused a little head scratching but I found a length of thick walled plastic tube of about the right diameter in my "plastics" box. (I also have a "metals" box.) I filed a flat along the length of the tube, actually exposing the hollow core. The core was further filed out which then enabled the length of tube to be fitted over the apex of the roof.

 

I have only traced 4 photos of the building, 3 of those are taken from a roughly three-quarter angle looking towards the plain end wall and only one is taken, again at a roughly three-quarter angle, of the wall with the extension. This one was taken after closure. I have no photo looking directly at the front (or indeed back) wall. The plan did not show the extension or detail of guttering and downpipes although it appears from the photos that there was guttering along the front and back, as indeed one would expect. I still had a few lengths of fine plastic angle which, if the external right angle is sanded down, makes very acceptable guttering. I must try and get more of this as the back gutter is made up of 4 strips as I didn't have one length long enough. The downpipes were plastic rod which fortunately takes a little bending. There was no sign of the downpipes on the front face of the building so I had to assume they angled in and were fixed to the end wall. Such is the joy of modelling a prototype location but I don't think anyone alive can tell me that's wrong!

 

One final complication was the chimney. The photo I used for reference showed the chimney lost in a haze but it was only after I looked at another photo did I realise the structure was a good deal higher than I had made it. It was also more elaborate at the top so I spent some time adding further layers. It is interesting to see how ornate chimneys could be when compared with the rest of a building.

 

blogentry-27632-0-19287000-1548100546_thumb.jpg

 

A couple of other minor points. The door handles are brass handrail knobs and the gap between the extension roof and the wall of the main building was covered by a strip of 5thou Plasticard to represent the lead flashing. I was quite pleased to see on a better photograph of Clifford station (the other on the Hay extension and with a similar, though larger building) that the lead flashing was prominent; I previously guessed it must have been there without any evidence. For those who don't know the Golden Valley Railway, it is worth mentioning that the branch originally ran from Pontrilas to Dorstone. The stations all had wooden buildings. Soon after opening the line was extended to Hay on Wye with three new stations, Clifford, Westbrook and Green's Siding. The latter was always just a halt but for some reason the other two stations were favoured with a substantial stone structure for the main building even though they contributed less traffic than Dorstone for example.

 

I can perhaps now make a start on painting the stonework. I found by Googling a colour photograph of an existing bridge on the Hay extension which was useful in determining the colour of stone used. It is clearly made from the same stone as Westbrook station building as the blocks appear identical, and indeed very similar to those on the embossed sheet I used. The bridge is a light brown with what I thought was a slight grey tinge, again similar to that used for the embossed sheet. This type of research is one of the interesting parts of modelling a prototype location and it's always a good feeling to fill one of the holes in your knowledge of the prototype.

 

This has been an interesting exercise and it's nice to be able to construct something from scratch rather than a kit. Now I have to think about what I do next.

  • Like 1

8 Comments


Recommended Comments

Lovely work, first time I've seen a model of one of these buildings at the upper end of the line.

 

Congratulations on your fine work, it looks almost livable :)

Thank you for your kind comments. I'm quite sure a model of Westbrook would be unique.

 

I did get down to Gaugemaster yesterday and found they only had the dark stone paint. One of the frustrations of modelling! Still I was able to drool over the Dapol 'O' gauge models.

Link to comment
  • RMweb Gold

Excellent modelling, and a very attractive prototype. The roof was well worth it, I think.

 

I sometimes wonder what prompted the GWR to select their stone colours (I like them but they are not, perhaps, a particularly elegant or refined combination of colours). However your test colouring of the doors and windows offers some clues: The colours add warmth, are light, and are very distinctive and recogniseable. You hardly even have to paint the rest of it! :-)

Link to comment

Excellent modelling, and a very attractive prototype. The roof was well worth it, I think.

 

I sometimes wonder what prompted the GWR to select their stone colours (I like them but they are not, perhaps, a particularly elegant or refined combination of colours). However your test colouring of the doors and windows offers some clues: The colours add warmth, are light, and are very distinctive and recogniseable. You hardly even have to paint the rest of it! :-)

Thanks Mikkel.

 

We'll see what the roof looks like when it's painted. I wasn't sure about the roof but the individual tiles do look better. I forgot to mention in the entry but I took the opportunity to put in a slipped tile, this quite often happened when the securing nails rusted. I've painted the walls using the photo of the bridge as a guide but it's very difficult. Weathered stone seems to take on a different hue every time you look at it.

 

I manged to get Railmatch Light Stone (I was wrong above, it was the dark stone they didn't have) which looks very similar to the Precision Paint version of that colour I had used previously. I'm looking at the colour samples in the HMRS guide which were matched with Swindon samples and IMHO what paint manufacturers purport to be light stone looks very much like dark stone. Light stone on the colour samples is almost a pale khaki colour, quite unlike any of the model paints that I've seen which tend to have a reddish-brown hue. It's not as warm as dark stone, or stone number 3 to give it the official designation. In fact looking at the two colours it's impossible to say what is dark or light, the shade seems the same and it's only be referring to the text that we know number 1 is light and number 3 dark.Stephen Williams in his book expressed similar reservations about the shades used but given the manner in which the paint was prepared I'm not too concerned as there must have been infinite variations throughout the system.

Link to comment
  • RMweb Gold

I seem to remember that the updated (post-Slinn) edition of Great Western Way had updated colour samples, which did away with the greyish colour commented on by Stephen Williams. I haven't got the new volume though.

 

See PM for another sample.

Link to comment

I seem to remember that the updated (post-Slinn) edition of Great Western Way had updated colour samples, which did away with the greyish colour commented on by Stephen Williams. I haven't got the new volume though.

 

See PM for another sample.

Many thanks Mikkel. I've replied with a PM.

Link to comment
  • RMweb Gold

I understood that the hues varied, depending on the way the site foreman mixed the paint and his interpretation of the 'official' colour charts?

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...