Johnson Street IEMD: Progress Update 16th August 2019


Johnson Street IEMD

201 views

The latest update from Johnson Street IEMD

 

16th August

 

The emphasis of detailing work has moved from the area around the Electric Shed to where the long term maintenance shed, fuelling point and storage sidings sit. This area will be non electrified and will see a hive of activity from the weekly fuel tank arrival and departure plus the maintenance access and shunting of locos being worked on away from the main depot access and the Overhead Electrification. 

 

Picture One

A view of an empty pre-open Shed Two - to be termed the ''Long Term maintenance shed''  taken as if from an amature drone

 

Picture Two

Taken by one of the Site Appraisal teams from DB Cargo UK whilst the site is being readied for their use - the fuel delivery point will be accessed by a once weekly delivery of a single tanker brought by rail to the site by a DB 60 or 66.

 

Picture Three

The Site Appraisal team leaving the Long Term Maintenance Shed having done their visit caught on the soon to be fitted bridge CCTV

 

Picture Four

The amature drone captures the team leaving the Long Term shed.

 

 

In time, I expect that several long term storage locos will sit just beyond the fuelling point, a Bachmann 90 in EWS or in RfD. I am currently mulling over the idea of a former RfD90 - maybe 90025 being DB logo'd still in RfD grey as a depot shunter for operations under ''the knitting''

 

IMG-20190816-WA0000[1].jpg

IMG-20190816-WA0001[1].jpg

IMG-20190816-WA0002[1].jpg

IMG-20190816-WA0003[1].jpg

  • Like 1

0 Comments


Recommended Comments

There are no comments to display.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...