Jump to content
 

CR 29 class in service and shunting.


Dave John

1,294 views

Well there we are, No. 203 in service. It looks all right from a distance, but harsh close ups show my lining inabilities. I did try some of the 2 part Fox transfers where you overlay black on a red/white line, but I just couldn’t get them to look right. The CR red/black/white was subtle with fine lines, hopefully one day a transfer maker will take pity on us.

 

 

604601694_Cl29RHS.JPG.cd7266fa013cf4ca5c44a4c21599d23f.JPG

 

 

 

 

1616136131_Cl29lhs.JPG.44617d02fbd8aa23068709ef89babd88.JPG

 

 

 

 

 

 

Then again what matters is how it runs. These engines were built for trip and shunting work, so a bit of video showing 203 doing just that.

 

 

 

 

I’m quite pleased with that. It will never win races with a 90-1 reduction, but it has considerable tractive effort and is very smooth, all previous pickup problems eliminated. The acid test is pushing a full train backwards through pointwork buffer to buffer and it passes that easily.

 

 

 

Edited by Dave John

  • Like 12
  • Craftsmanship/clever 12
  • Round of applause 1

5 Comments


Recommended Comments

  • RMweb Gold

Very nice Dave, and a smooth runner by the looks of it.  I do enjoy your videos, first time I have seen a full train on the bridge I think, a great sight. You must be very pleased.

 

Is there much more to do on the layout? I can't see any unfinished bits.

Link to comment
  • RMweb Premium

Heh, thanks Mikkel. I have progressed reasonably well with things, but there are still lots of things to keep me going. Nowhere near finished yet.

 

I might as well add a TTD list here so I can find it and so folk can prod me ;

 

Signal box

Telegraph poles

Signal wire supports

sort out the scenery at the right hand end

Research a more correct goods shed and build one.

Oil store/lamp hut

Better yard facilities

Build a fill in section for the other end of the viaduct and sort that corner out.

More transport.

Platform furniture/running in board

Fix the jammed ground signal

Stair down from bridge to street

weighbridge

Improvements to goods in yard

Plenty of minor scenic corrections and additions

 

Oh, and some manure........ 

 

Well thats a start, for the stock side;

 

Coaches.

More sheeted wagons( aye ok, a D299 on its travels)

More npcs

Brake wagons/vans

The rest of the CR condensing fleet……

 

Operationally I am thinking about some sort of running schedule.

 

I also quite fancy playing with an ambient soundscape.

 

Ho hum.

Edited by Dave John
Link to comment
  • RMweb Gold

 

Quote

It will never win races with a 90-1 reduction,

But some spirited running was still possible.

Quote

The acid test is pushing a full train backwards through pointwork buffer to buffer and it passes that easily.

And at speed!

 

Nice running.

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...