Jump to content
 

Trackwork #5


RedgateModels

246 views

So I set up the building board again, this time for the "plain" dual gauge track leading to the fiddle yard

 

DSC_1002.JPG.86e3d35084ebf4a65a1a3c5d37431b68.JPG

 

I did have an idea though that if I could make another fixed blade "crossing" I could move the NG track to the centre just before the fiddle yard exit to make it possible to have dual gauge cassettes that could be turned round ....

 

DSC_1004.JPG.aebe62170ca17beafa2a96ff7175dc0d.JPG

 

Seems to work, I can always rip it out and make it plain if it causes trouble ;)

 

Here's the section in it's entirety

 

DSC_1003.JPG.22c73ac4efacab88f9abd2f372074669.JPG

 

Just got the plain standard gauge track siding to build and I'm only doing that as I've got no more code 75 flexi left :D

 

 

  • Like 1
  • Craftsmanship/clever 2

1 Comment


Recommended Comments

I would make the narrow gauge check rail a bit longer so that the narrow gauge wagons are pulled over well before the track diverges.

 

Gordon A

  • Like 1
Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...