Jump to content
 

Groundworks


RedgateModels

278 views

So, after an extended period of procrastination I settled on the final position of the conveyor pit - right over a strengthening rib under the baseboard LOL

 

DSC_1041.thumb.JPG.0cd21b73e516f0b0ac3995552220adcd.JPG

 

Nothing now for it I got the 2 layers of 3mm foam core stuck down to bring the level up to that of the boxfile

 

DSC_1042.thumb.JPG.8fd9bafc3d4ccb35a933936c66633bcc.JPG

 

and then using some left over View Glue I stuck down the track plan

 

DSC_1044.thumb.JPG.30e7490fcf4b8a64dba7fb0109e6dedc.JPG

 

It was important to get this down as the positioning of the dual gauge pointwork is critical to the plan.

 

Next steps are to start cutting holes - a nice slot in the backscene behind the boxfile so I can marshall narrow gauge trains - the plan is for tipper wagons to trundle out from behind the boxfile to then be shunted over the conveyor pit etc. Oh yes, the hole for the conveyor pit along with removing some of the strengthening rib. One more hole will be needed for the fiddle yard exit, but as I've not yet decided how high this will be it will have to wait until terraforming has been done ......

 

Edited by RedgateModels

  • Like 1

0 Comments


Recommended Comments

There are no comments to display.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...