00 track finalisation - Where to isolate?
Surfing the wave of a functioning layout to look at the 'nice to haves' ...
Currently trains can be parked in the sidings or the lower space between points 9 and 10, but there are a couple of glitches that prevent more flexibility:
Between points 8 - 6. It would be nice to have a train waiting at the platform while another could shunt out of the sidings onto track 2, however this is currently impossible as the LH Point 8 and RH point 6 means that the track between them is always live. If this was isolated would the power be interlocked with points 6? It would make sense but adds complexity and would break the continues loop of current. Is this worth it?
Between points 8 - 10. Currently, if there is a train parked between points 9 and 10, on the lower route, another train can't run from 8 to 10 on the middle route as both points 9 are linked and to set the route for the middle would also power the parked train from behind. I could isolate the lower route just after points 9 and link a power source to points 10?
Additional siding from points 10 parallel to the bottom of the board, which would give a refuge for a loco and allow an exchange of carriages or wagons. Would it bring any useful operational benefit?
Maybe overthinking this
4 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now