Morning all. After an interesting couple of weeks, I've started working on the station building again and moved on to the roof. The parts were cut when I had the rest of the building done and I can now start to assemble the parts. The distinctive ends are layers of mdf, row mark and perspex, sandwiched together and set with spray mount. The top edge is then glued into the roof slab, the underside of which I had rendered to match the diagonal planking. The colour will need lightening a bit from the rattle can I used.

I also cut a layer of joists which increase the effective thickness. I should have a second layer of purlins, running horizontally along the roof line between the joists and the roof, but I wanted to make the roof as rigid as possible and I don't think anyone will notice. I can always add something cosmetically after (he says knowing full well he won't).

Glad to say the roof has turned out well and fits nicely onto the station walls. Just a little bit of fettling to do to get it to sit without visible gaps. They I can turn my attention to the trussing.

I've had to re-draw the clerestory roof as it consists of glazed panels, rather than solid as I first thought. They're on order from York Modelmaking, along with a miscellany of detailing parts; bargeboards, brackets, quoins, footbridge parts, including balustrades and the rather nice entrance gates. I've been informed they can all be cut from Rowmark so we'll see what turns up.

Turns out the shed roof was clad with double Roman tiles rather than decorative flat tiles as per the annex buildings so that will make like easier.

The walls have had the mortar courses filled with a ready mix filler and I need to add final stonework colouring, which will be a darker colour than at present.

 

I've also made the former garage in the station forecourt that housed the motor buses used to connect to Burnham-on-Sea in the 1930's. I had to shorten it a bit as I wanted this building to be fixed down and it's duly been plonked onto the layout. The terraformed station forecourt area has worked well and I've trial fitted the platform surfaces from 1mm thick Palight and added a couple of Lanarkshire Model's GWR bufferstops in the up yard.

 

 

 

 

 

 

 

 

 

 

 

 

IMG_4332.jpeg

IMG_4337.jpeg

IMG_4335.jpeg

IMG_4338.jpeg

IMG_4340.jpeg

IMG_4343.jpeg

IMG_4344.jpeg

IMG_4345.jpeg

IMG_4346.jpeg

IMG_4347.jpeg

IMG_4319.jpeg

IMG_4323.jpeg

Edited by ullypug
photo

  • Like 15
  • Craftsmanship/clever 13

10 Comments


Recommended Comments

  • RMweb Premium
20 minutes ago, Dave Holt said:

Lovely modelling, Andrew. Must have been one heck of a rough shunt, though.

Dave.

I figured as it’s P4 nobody would notice anything unusual! 

  • Like 1
  • Funny 2
Link to comment
  • RMweb Gold

Excellent Andrew. Can I ask how you cut the blue/XPS foam? I find it easy to cut straight but curves less so, and was wondering if it's just me. I do have a hot wire cutter but understand it's not very healthy to use on on blue foam. 

 

Logo on the door is a nice touch.

Link to comment
  • RMweb Premium
4 hours ago, Mikkel said:

Excellent Andrew. Can I ask how you cut the blue/XPS foam? I find it easy to cut straight but curves less so, and was wondering if it's just me. I do have a hot wire cutter but understand it's not very healthy to use on on blue foam. 

 

Logo on the door is a nice touch.

Hi Mikkel 

I must be lucky as I’ve only ever used a sharp scalpel to cut it.

when I’ve cut the thicker stuff for baseboards I’ve used conventional saws.

  • Thanks 1
Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...