Jump to content
 
  • entries
    3
  • comments
    89
  • views
    2,597

enginelane

1,065 views

Not making much progress with Lay-out in the garage due to cold weather and ill health so having seen one of the fiddle yard boards from the now defunct US Monon layout Vimes Street decided to have a go at creating a small layout that could be set up quickly and inside the house.

 

board measures 9 in by 48 in and will be connected to simple cassettes made for a past layout. 
 

The time period selected uses some steam locos and early BR diesels i have in the collection and uses existing rolling stock. 
 

simple plan

 

77D20345-1B2C-4699-ACAC-198285E62CCA.jpeg.697bd5470482a6fbac541e430fe44564.jpeg

 

A connects to lines on BR and served via cassettes

 

B is the scenic board with a refuge siding and two storage sidings which serve industries off at D. The main industries is a small glass works and metal box company. As such represents industry around the Barnsley area which had small glassworks. The metal box factory was a former WW1 munitions site which converted into making many different decorative designs for biscuits, sweets etc. The refuge siding is used to store traffic for a small off site gas works. 
 

C is the line continuing onto other off scene industries as well as other lines.

 

exit off to A hidden by brick plinth bridge with plate girder sides. 
 

exit to C via a short span bridge more of alley walkway rather than road bridge,

 

small brick Signal box will be used that did not get on another layout. 
 

back scene brick embankment with representation  of ends oh houses .

 

idea is to use up as much as possible materials already in store and designed to get something running.

 

points are to be operated by simple slide switch.

 

754938F1-1B5F-48A2-B941-64B71D3993DE.jpeg.edb98162753130e0fdeb01155fa53906.jpeg

 

wired up this morning and all lines worked!

 

need to construct the two fiddle boards to hold the cassettes.

 

  • Like 2

40 Comments


Recommended Comments



Raining so no garage clearing but used up odds and sods to create a storage and transport box for DCC system. Just needs a cable holder for the mains lead to be fitted 

CD507C23-A871-4984-A44E-F73365D0D7D7.jpeg

DFD4FFAE-ED10-4664-BDEB-8432447643D4.jpeg

Link to comment

Track painted, and inside house as bit nippy out in the wind today. 
set up some stock to test clearances on points and sidings. Not likely to be ever this busy when running but looks like 5 in each of the industry sidings plus 8 in the front siding means long length trains can run and be shunted. 

0681C8CB-7830-4827-8C5F-3944A9144ADD.jpeg

C0882D18-F4F2-491C-93B7-18FA1AEE4D26.jpeg

71D45FC7-DCAD-4C51-8804-AFA82E6026F6.jpeg

068B9B1F-D6D3-4289-B880-A4A945D72240.jpeg

Link to comment

Ballast added today. Not one of my favourite tasks but at least not a lot to do. Worked the point blades a few times to ensure they are not glued up. Left to dry overnight.

E260804E-0F0E-4E3B-9299-F72BBFC68FD4.jpeg

Link to comment

In the Spirit of using materials in stock then base ground cover added by Woodland Scenics. It’s a funny brown and hoping colour will fade when dry. Bag said £1.50 so I think it’s been around awhile! 

ACCEF59C-FEB7-4CB9-BDB6-AE1C8785A1B2.jpeg

Link to comment

Vegetation and additional layers of ground cover added. Sidings attempted to have sand spillage over time . When dried will add a wash of black over all ballast 

19A2DCAB-A53A-4BDF-82BD-60D1C3206AE9.jpeg

130A838D-0802-480D-ADFB-8E1BFE92E09C.jpeg

9A1E3A19-5564-46CC-97CC-5433770AD442.jpeg

Link to comment

Just a couple of cameos - post van collecting mail, holding up bus ,

 

couple of workers exchanging a greeting as they pass by on the lane bridge 

AE468708-AEE9-45ED-B811-4594D26F19D8.jpeg

Link to comment

This mornings modelling session is mostly bauxite. Adding missing detail from all those unfinished wagons. 

911578B6-A06F-4FDD-8D27-352BE2688D84.jpeg

Link to comment

Running trains revealed that the fiddleyard boards are too narrow and more space required to store additional cassettes and stock. Found a piece of thin ply and some off cuts to extend the apron by 10 cms on both boards.

83130353-F671-42AE-8C71-A618D07E1CE0.jpeg

Link to comment

The flying Leads on the ends of the cassettes were getting pulled so made up some sockets and then some jumper Leads as a trial. 

257E93A5-E602-437D-A972-88A3102B073E.jpeg

Link to comment

Completing all the little jobs today including making a couple more cassettes. Added more weathering powders to sidings 

38513979-318B-4BF5-9217-55B26882EDEC.jpeg

124324B4-7DA2-4E48-935D-328B42DFE240.jpeg

Link to comment

Apart from the junction signal I reckon that is it for Kiln Lane.enjoyed building it and using up bits and things in stock. I have another ex Vimes Street fiddleyard left, might see what I can make of that! 
 

 

505AAEB7-4DAA-4B11-B0FB-4E7B75EF7B8D.jpeg

6E1F77F3-FD4D-4CBB-88C1-51E98851396F.jpeg

1683D569-1C18-49B7-80DE-551E9610FF2C.jpeg

97695D31-B904-44D3-AE18-7F2DF27E3259.jpeg

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...