Cheddar P4 - March 2020 update
This month I have been mainly doing tiling.
With the footbridge finished, it was time to turn to the building range roofs. At 2 feet long, that's a shed load of tiles. Add the pattern of alternate square and round tiles and I wasn't left with much of a choice but to go with York Modelmaking 2mm tiles and take my time. After a few sessions, we finally got to the stage where it was coming together. The tiles were painted with a mixture of Vallejo and Lifecolor acrylics to match the main shed tiles.
Chimneys added from the usual Green Stuff World ABS sheet and self adhesive quoin details from York. The gates and bargeboards have turned out beautifully, amazing what can be cut in Rowmark. The bargeboards are a couple of layers, stuck together with solvent.
Shed bargeboards have had their final painting and fitting
Canopies are done and I'm just debating how to fix them in place. Pins through into the walls seem like a sensible idea as the glues surface offered by the brackets isn't going to hold much.
Suddenly the list of jobs to do doesn't seem so long. Well, there's the internal shed trussing but I'm not starting that just yet, though I do have another cunning plan.
I am feeling quite pleased with how this has turned out. It just screams Cheddar to me anyway!
Edited by ullypug
photo reinsert
- 11
- 1
- 16
7 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now