Jump to content
 

Early Airfix - (now Dapol) non corridors a postscript


pbkloss

225 views

having been absorbed in house and garage renovations plus a lot of travelling there's not been much modelling going on, but the odd thing is happening and things at Weston super Mare (S&D terminus) have been crawling forward.  In parallel with trying to resurrect the layout boards that I moved  house with (a blog entry in the imminent future will explain) I have been trying to finish off some stock to run on said resurrected boards to test it. So the trusty early Airfix - (now Dapol) non corridors have been dusted off with the aim of trying to complete them and have a functioning two coach ex LMS local train for those trips to Evercreech junction and Glastonbury via Uphill junction, a diverted Strawberry line to Axbridge and Wells (S&D).  The things left to do were to fix the roofs that were floating and to couple the two coaches together - and lo it has been done! however, I still need to fix the under frame cross trussing which has been damaged on the Lav compo and a torpedo vent has gone missing. Plus if I have the courage, fitting the missing 'First' and 'No smoking' labels to the appropriate windows!!

 

so here they are, sitting in platform 1 waiting to go somewhere! In the test running I found not everything happy in the running department and there is still some debugging of the compensated bogies (MJT) which I have a real problem in getting flexible enough, getting square and flat (despite using jigs) and problems with clearances between P4 wheels and the underframe of a commercial coach, (even though the Airfix coaches were designed to have wheels swapped out!).

 

Firstly from the Lav Compo end

lmsnc-mar20-1.JPG.23ebd48ee91c28503ea97d992a8aefa3.JPG

 

the join between the two coaches with Hornby close couplers (just anything to join the two ....) missing vent rather obvious :-(

 

lmsnc-mar20-2.JPG.415d4209e4344365f645725839e79596.JPG

 

and lastly a view from the Lav brake end

 

lmsnc-mar20-3.JPG.79179876c4b098784eff0adea3cc871c.JPG

 

now for some more test running, shunting them through the layout from arrival platform (s) to the empty carriage sidings to the in-between platform storage road and then into a platform for departure.  I'll let you know how it goes and may even be a video one day ....

0 Comments


Recommended Comments

There are no comments to display.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...