Bodmin General(ish) Track laying starts 8
December since I last posted about Bodminish, the run up to Christmas was busy and with retirement looming due to the hours my shifts were I was getting too tired to do much else, plus I had a few jobs outstanding prior to the carpenter coming to fit new doors downstairs. I had a weeks holiday the week before last and supposedly another 6 weeks until retirement. That was the plan before Boris stepped in, now on furlow till the 1st of May when I retire
Well the past 2 weeks I have been converting a Wills E1 and E2 to EM gauge plus finishing off a second E2, one E2 is primed the second is waiting for the steps to be fitted so it can be primed, The E1 is waiting for a couple of gears from High Level and has one of their new coreless motors powering it. Now I need a better test bed for both what better than start laying track for Bodmin
The track is in place, now needs fishplates, wiring and I have fitted temporary tiebars, the E2 in the photo supports a Comet Jinty chassis (the Wills E2 is designed to take the Triang Hornby Jinty chassis) and is powered by a High Level Kits coreless motor, the Kirk coaches are waiting for either EM wheels or whitemetal EM bogies (still undecided). The E2 was part built but off Ebay. The second photo was another part built (to EM gauge) buy from Ebay, primed today.
- 6
- 1
2 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now