Churchward County bars and beams
A centre spacer got in the way of the compensation beams that are supplied on the etch so I replaced this with one I fettled from a Comet P4 spacer which was the correct width.
I also removed some of the lower spacer (that's there to attached the pickup working) in order to make a bit more space for the gearbox.
Latest status is that High Level hornguides fitted and the beams now in place with a suitable pivot. Gearbox has been swapped out for a High Level RoadRunner at the mo which is pushed out the way o show the beam arrangement.
Cylinders and slide bars now constructed and ready to be fitted.
I only have one other engine with outside cylinders in my kit mountain to build and that's a Malcolm Mitchell 45xx which will be back dated. As stated previously, the reason for these current builds is to check clearances before fixing platforms and bridges on the layout etc.
- 7
- 1
2 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now