Apologies - this seems very disjointed as it was written across a house move and as a result my plans had to adjust as the space the layout will go in is different, again. In the process I had to pack the layout to move it, and I decided to renew the boards as the old ones, with 40 year old chip board had distorted with time so that none of the joints were flat .... so this is a June  2022 edit / correction of what I wrote nearly a year ago before the move, forced by the rmweb catastrophe that wiped all the photos uploaded in the last year:

 

A minor update since the last entry and a track plan of sorts as promised.  The extra length I have allows the station throat to be stretched over 5 or 6 feet as opposed to being cramped within three feet as before - much smoother curves and hopefully a better alignment and running

 

First a photo update showing more flexi track laid along the curve:

 

new-board-pano-2.jpg.thumb.JPG.e76d2f77e2d617b75917317fe8d623b7.JPG

 

 

now with the first cross over built

 

new-throat-board-1t.thumb.jpg.8639149edf13c3b7908ccb4e7424eb45.jpg

 

And now a drawing of the projected layout of the main lines. I'm hopeful of adding a small goods yard off the single slip on the extended head shunt 'below' the running lines .... will actually map that out on the real boards when the main lines are done

 

The fancy double curves are down to re-design forced by the move and the desire to re use as much of the previously built pointwork as possible, in particular the 3-way point in the up main to platforms 3, 4 and the central sidings as before

 

 

new-throat-drwg-4.thumb.jpg.cb7cfbd93c99a2d672e7e7aa0b6454f4.jpg

 

If you are wondering about a trailing cross over from DM to UM that is off to the right, there is one, around the bend (!).

thats it for now ....

 

new-board-pano-3.JPG

new-board-sta-1.jpg

Edited by pbkloss

  • Like 3

1 Comment


Recommended Comments

One massive advantage of the new plan, without the facing and trailing crossovers crossing each other as in the old compact layout of the station throat, is that from an electrical point of view the wiring is much simpler.  In the old, both crossovers could not be simultaneously reversed as it would cause a short at the diamond crossing, in effect I needed interlocking for electrical as well as operational reasons.  Now, it will be just for operational / signalling reasons, much easier to wire. Avoiding DCC as yet, I plan to have the track feeds at the destination end, i.e. arriving trains will be fed by an 'arrivals' controller that can be switched to each platform end track, and departing trains from a controller at the fiddle yard end, I will still need to ensure by some means that the two controllers don't get inadvertently  connected!

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...