Jump to content
 

GWR provender wagons


Mikkel

6,034 views

In 1884 the GWR centralized the provision of provender, so that every stable block on the system received a regular supply by rail from the provender store at Didcot, typically every 1-2 weeks. The supplies consisted of hay, chaff, straw bedding and sacks of feed. The feed included oats, beans and maize, either pre-mixed or separate.

 

The sizeable stable block at Farthing obviously needs a regular supply of feed and bedding, so two provender wagons have been made. I began with a diagram Q1, using the Coopercraft kit.

 

002.jpg.96b931f5e6d38a35147d5b88c804501c.jpg

 

 

 

The GWR only made a total of 12 dedicated provender wagons, in two slightly different lots of six. The Q1 kit represents the later batch, built in 1903 with diagonal bracing. They were very camera shy, the (cropped) image below is the only one I have seen so far.

 

003.jpg.34190199e7f5d0c08eb40a3b1d211a13.jpg

 

 

 

As usual, the build involved modifications. The Vee hanger on these wagons was significantly off-center, towards the right. The instructions don’t mention this. So both vees were cut off. The solebars need shortening, and the end brackets must therefore also come off. Here is the original solebar (top), and a modified one (below).

 

004.jpg.4ad19cbaf44525515257e03667de602b.jpg

 

 

 

Then, sides and ends. The locating pips for the floor were removed. They make the floor sit too low, and the solebars in turn end up beneath the headstocks.

 

005.jpg.3da644e4e1c8788d734595e96ade5be1.jpg



 

As provided, the brake gear does not take the off-center Vee into account, as this trial fit shows.

 

006.jpg.258c9e015c02556a37567de8af83403a.jpg

 

 

 

So the brake gear was modified to suit. Looks a bit odd, but that's what the drawing and text in Atkins et al shows.

 

007.jpg.53388b78487cd13ee75d05eefdd3facd.jpg

 

 

 

 The DC1 brake gear was made using parts from the  Bill Bedford etch (recently withdrawn). The buffers are from Lanarkshire Models.

 

008.jpg.b255e99c0b4996aa8d07614e73991e03.jpg

 

 

 

The built-up wagon in GWR wagon red, as it would have been painted when built in 1903.

 

009.jpg.b55a01baae588571eedb0a3058bd78b2.jpg

 

 

 

Apart from 12 purpose-built provender wagons, most of the GWR's provender was carried in numerous standard open wagons of all sorts. Several photos show them loaded improbably high. I decided to have a go at replicating this. This close crop, from a much larger shot from Vastern Rd yard at Reading, illustrates what I was aiming for.

 

010.JPG.dded0785398ac296c0feb32310651b78.JPG

 

 


I set to work on some plumber’s hemp, cut fine and built up in layers on a foamboard box, using diluted PVA. Not the 9 o’clock news!

 

011.jpg.d718cb4e2d6e42e2292f947714d3a167.jpg

 

 


Then sheets (a.k.a. tarps) were made, using my usual method. Ian’s superb sheets were re-numbered and printed on regular paper, then laminated with thin foil and varnished multiple times, before weathering. The result is a shell that can be easily shaped and supports it’s own weight (see this post).

 

012.jpg.d8565bb286d397570c8b90b4441541a4.jpg


 


I designed the load to fit my 4-plankers. My initial plan was to have the entire load and sheeting detachable, in line with my normal approach. In this shot, the tarp and load are separate, but magnets hold them together and allow easy removal.

 

013.jpg.dc46782749d2ae917188defedf6f4044.jpg

 

 


However, with a high load like this I felt that the lack of roping looked odd. So I decided to see how it would feel to have permanent loads and sheets. I  recruited one of my 4-plankers and added roping and side-cords, using painted sewing thread.

 

014.jpg.6ba3d436400b29fa44c708556febc0d8.jpg

 

 


Indents were made in the sheeting by pressing the edge of a ruler into the paper/foil shell, in order to emulate the ropes pulling down the sheet.

 

015.jpg.afe5db69e394de05cb1e3dcca2e489a2.jpg

 


This is what I ended up with. Don’t look to closely at how the cords are tied at the ends. Photos of provender trains don’t show clearly whether and how they were used in a situation like this.

 016.jpg.99ee1f68de4f4a106ccbc64b547c4d63.jpg

 

 


Sometimes, the GWR used two sheets laid sideways instead, as illustrated in this cropped detail of a train of hay bales.

 

017.jpg.93de07d3e8a00271299f7c991920844f.jpg

 

 


I decided to do the same on my high-sided Q1 wagon. Here is the usual foil shell, this time composed of two sheets.

 

018.jpg.42140a9604a83f97d6079bed2331002b.jpg

 

 


For the roping and cords, I loosely followed the cropped image above.  I also tried to fold the sheets at the ends as per that photo, but gave up:  Try as I might, it just looked weird in 4mm scale. Another time maybe.

 

019.jpg.f681b265132420252cdfe8ccd0635973.jpg

 

 

 

The wagons together. The charm of everyday solutions versus boxy functional design.

 

001.jpg.802d6eb45c51d8b466c009311c11a7e9.jpg

 

 

 
Here are a few photos of the wagons in action on the (unfinished) new layout. A Buffalo class arrives with the weekly delivery of provender. Conveniently, the stable block at Farthing happens to have a siding alongside.

 

020.jpg.ce15c27dfa8c9373fd720d4db1a23a81.jpg

 


Meanwhile, Betty is having a drink in preparation for the morning round. Proper care of railway horses was a serious matter, though hardly for ethical reasons. Horses were a company asset and an important part of operations, so obviously needed good maintenance. 

 

021.jpg.9b3962748991299f03e252e33f4f0908.jpg

 

 


The loco has left, and the wagons are sat in the sidings. The camera has exaggerated the sheen.

 

022.jpg.02fc626ebe023ccd58513e4742f8a31d.jpg

 

 

 

A close-up, warts and all. The mind struggles to accept that the hay wasn't completely covered over. There is room for improvement with the roping and cords, several lessons learnt there.

 

023.jpg.4578a2b3feb5e18581b9f281c0ef06cf.jpg

 


I'd like to experiment more with the shaping of the sheets. Here I have made slight rounded indents along the bottom to avoid a straight line. Period photos show that, although sheets were pulled as taut as possible, there were still lots of wrinkles etc. 

 

024.jpg.6fdfe61de734fb8015892a5a5019896d.jpg

 

 

Despite these experiments, I’m still undecided about permanent loads and sheeting. To illustrate my doubt: It's the next day and the Buffalo class is back to pick up the provender wagons. But wait, what’s this? They are still full and sheeted! More thinking needed. It never ends.

 

025.jpg.11fbd596caec9f9014c42623f908ffef.jpg

 

 

 

Edited by Mikkel

  • Like 24
  • Informative/Useful 1
  • Craftsmanship/clever 24
  • Round of applause 2

78 Comments


Recommended Comments



Excellent. Never seen that before. (Actually, I probably have, in the DN&S book, but have forgotten about it!)

Edited by Miss Prism
Link to comment

Very impressive.  I think the stable block looks a bit too clean though.  If the place has just been swept, you need a tired looking bloke with a shovel standing by a big heap, perhaps fitted with smoke unit to give off steam!

 

I like your use of magnets.  The plumbers' hemp looks convincing.

  • Thanks 1
Link to comment
  • RMweb Gold

Many thanks Michael. And yes you are quite right, I need to add lots of horse dung, scattered straw and other pleasantries. I have been experimenting with it, but got distracted.

 

The idea of a bloke with a shovel is great, will do that! Earlier we also discussed 'crossing sweepers', I'm planning to have such a gent outside the yard sweeping the road. 

  • Like 2
Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

×
×
  • Create New...