2. Viaduct sides and 3-way turnouts.
Apart from problems with 0-6-0 shunters stalling on the 3-way 'king' point, all is going well with the layout so far. Thus tempting fate, I hope to start sawing the plywood sides of the viaduct level to-day, plus re-number a Dapol '73', and try and see where the shunters are losing power on the afore-mentioned point. I posed some rolling stock this morning for a 'vacuum-braked wagon-load' photo-shoot to send to a chum, which might be of interest, working along the layout from 'north to south':
The sherry tubes are where the grain/flour/sugar silos will be, the cardboard boxes the warehouses, to help with sight-lines. I know the Sussex Weald was hardly a 'hub' for sugar-refining, but I could not resist the wagons. Sorry about the lurid 'flash' lighting! The milk tank and PMV is where the passenger station will be (track yet to be found and purchased).
Edited by C126
0 Comments
Recommended Comments
There are no comments to display.
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now