Details, details...
So today I carried on the road cone production line as well as putting more signage about the place and making a couple of extra stop barriers for the lower Linkspan.
(cone and barrier production line)
I also added some more bases to some of the cones to make it look like they have been stacked up on each other.
The next detail was pre-bought. Some grit bins from scale model scenery.
(a pack of salt / grit bins. I didn't feel able to scratchbuild these at n gauge)
I placed these at the top of the ramp and at the ends of the Linkspans where a bit of salt/grit on a icy morning might be appreciated.
(gritbin installed at top of ramp)
(and another by the portakabin)
Finally I added the signage and lifting barriers to the entrance of the lower Linkspan and some more signage to the upper linkspan.
(lower Linkspan signage and barriers installed)
(additional upper Linkspan signage with cones and grit bin in place)
(a shot of this end of the layout now coming together)
It might be time to do a bit more das clay work on another part of the layout to progress things on a bit.
Thanks for reading
- 1
- 1
2 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now