More signs, barriers, and some point levers
More detailing around the lower yard today having painted the track work yesterday.
(das clay and ballast on the lower yard)
(trackwork painted)
The first detail around the yard were more crash barriers to prevent vehicles driving onto the tracks
(barrier by the parking bay)
The next detail was point levers. I made these by bending some 1mm brass tube with plyers and sticking them in some 3mm thick balsa.
(point lever installed)
I then got on with more signs around the yard including stop boards, stop look listen signs, and no admittance signs.
(stop board on the Linkspan headshunt)
(lower yard sign, point lever, painted buffers, and barriers all installed now)
(pedestrian access to customs warehouse with barriers and stop look listen sign.)
(stop board and 25mph sign on exit from lower yard)
(5mph signage now installed on the Linkspan)
(a dramatic night time shot from under the Linkspan to newly installed barriers)
Having completed the majority of the lower yard the next area I will start on is the upper rail area which will be the last major area of das clay
Thanks for reading
- 2
0 Comments
Recommended Comments
There are no comments to display.
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now