Jump to content
 
  • entries
    22
  • comments
    33
  • views
    3,295

Daunting number of locomotives - a possible solution


Yan

315 views

While I'm waiting for timber to arrive for baseboards and track I'm having another purge on stuff that I've accumulated over the years. As it would be daft to move on stuff that I'll need, it has made me consider the stock requirements for Rospeath Lane.

 

The year I'm aiming to represent is 1959 (as the shed would still have had a good quantity of steam locomotives but the first Diesel Hydraulics and Class 08 shunters would be seen). As well as being the end of the summer months for scenic interest, August seems to be the start of the decline of steam in Cornwall. In August 1959 Long Rock (Penzance) had 33 Steam locomotives and 1 Diesel Shunter allocated. The allocation was; 12 x Granges, 4 x Counties, 4 x Halls, 2 x Castles, 4 x 45xx, 2 x 4575, 2 x 94xx, 1 x Modified Hall, 1 x 51xx, 1 x 57xx & 1 x Class 08. To build all these locomotives in P4 is a daunting thought as I'd also require a quantity of visiting locomotives from other Cornish sheds and from further afield.

 

In looking over the track plan I was able to squeeze into the reduced size of my 'Man Cave' the layout will not be able to stable 34 locomotive let alone any visiting Locomotives from Laira or further afield. At a push I think it would accommodate around 25 to 27 locomotives depending on the split between Tender and Tank engines. With this in mind I created a sliding scale in the hope this would allow me to proportionally reduce the locomotives but still represent the type of allocation this shed would have stabled.

 

1177252483_LocoallocationslidingScale.jpg.64bf2c84757c8e4a4772a6b7344cae70.jpg

 

In some ways the anomaly I have with the model being too small for the location works to my advantage. I feel that working towards building 17 locomotives plus approximately 5 more for working the fictitious lines west of Penzance is an achievable objective.

 

2 Comments


Recommended Comments

  • RMweb Premium

How many of the allocation were at works for overhaul? How many were on loan? How many were stopped away? And lastly, how many were out at work at any given time of the day? 
I’d build one of each class/variant/livery that fits the location and you fancy building and take it from there. 
 

Edited by MPR
  • Like 1
Link to comment
4 minutes ago, MPR said:

How many of the allocation were at works for overhaul? How many were on loan? How many were stopped away? And lastly, how many were out at work at any given time of the day? 
I’d build one of each class/variant/livery that fits the location and you fancy building and take it from there. 
 

Points taken on board, those ideas will come into play especially if I get the proposed card system working for adding that curved ball into the loco rosters .

 

It was the daunting realisation that there were 12 Granges allocated to Long Rock that prompted me to do the sliding scale. I have 2 Hornby Granges converted to P4 with a kit in-stock to build but the thought of building many more was... well... not a possibly in the time I have left in this world if I'm get other locos build/converted.

 

In the future I would also like to run a Sunday Timetable so overall I'll need to get the proportions correct for locos to stabling space with an eye on what the loco requirements will be for a cut-down Weekday & Saturday Penzance timetable.

 

Thanks for the comment MPR

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

×
×
  • Create New...