Trains running for first time in months
Back in May 2019 I packed the layout away expecting it to be up and running again in about 12 months. Here we are over 2 years later and it's finally installed and working. A big pat on the back for me. It's being a crazy year what with house structural problems and other personal matters to deal with
Here we are then. This board now in its 17th year and 4th home has been rewired with new merg cbus electronics soon to be installed. I've added a narrow board for the new analog upper level and that's all wired up and working (it's only 2m long) but might add a merg autoshuttle for the time being.
I've just started adding the buildings, so much damage and repairs to do. I found a model of motorbike I can't even remember where that was located. So much tidying to do. Spent most of the afternoon tweaking microswitches and working on short circuit repairs
Dcc controller is kaput which is a bit annoying but it's only reading 0.004 volt on the output so at the moment I'm running 1 engine (no sections as it's dcc) and my spare type e analog controller is hooked up
However it's working and I can run trains on a 2m long board so I'm really happy.
Next job is a bit more tidying and repairs and to get cbus modules installed. I'm using command strips attached to thin ply so I can remove the modules easily if I have to.
- 2
3 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now