Saltney. It's all a load of walls
Finally got round to painting the retaining walls along the edge of the LM yard. About 9 foot of it..
It was all painted in a concrete colour, allowed to dry then a colour mixed about 50/50 matt black and Humbrol 26 ("matt dark earth" I think) brushed diagonally over the raised bits. took about 3 and a half hours including brew breaks. I think it looks ok.
Steve's now started the GW station track laying. The station throat board is removeable at the moment, so it can taken down for wiring and fixing up the point motors. It will then be fastened down permanently in the hope that nothing fails below the basebord
2 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now