Jump to content
 
  • entries
    266
  • comments
    645
  • views
    159,616

First Run


RedgateModels

389 views

Got the right hand coupling rods soldered up last night, looking better than the left so might do some remedial work on the left set once the chassis is all set up and running....

 

So with a few bits of electical wire insulation on the crank pins to hold the rods in place power was appled to the motor

 

blogentry-6717-127659878282.jpg

 

it runs, just. I did expect this, the crank pin holes were drilled 1mm which is barely enough to allow the pins to pass through. I will ream out these holes a little at a time working in pairs of wheels to remove the "sticks" then give the whole lot a good run in on the rollers.

 

UPDATE:

 

tacked the crank washers in place with a little superglue and gave the chassis a run on the rollers. Pretty pleased :D

 

http://www.youtube.com/watch?v=Z9coLr8nZYI

2 Comments


Recommended Comments

  • RMweb Gold

might hack out a slot in the boiler lower and fit the body for you tonight ;) although I've just noticed I've not put the front bogie fixing spacer in place, so I've got to build up the front bogie :lol:

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...